Update Jobstream Schedule

Update Jobstream Schedule

In ASPIRE, go to Administration -> Jobstream
Select the jobstream job that needs to be updated.
In the Schedule section, update the schedule to the desired date/time.
If the save icon does not activate, make a change to the Job Name field, then change it back.  This should activate the save icon so you can save your changes.





    • Related Articles

    • How to utilize the Global Equipment Update Module

      The Global Equipment Update Module launches from the Contract Explorer > Equipment screen, and creates an Excel spreadsheet of the existing equipment line-items and details. It allows a user to edit data and import it back into ASPIRE for the same ...
    • Instructions for JobStream 5.20.54 Maintenance Task

      See attached document for complete description. Admin users that upgrade to ASPIRE version 5.20.54 and later may see a new system-defined JobStream task, ‘5.20.54 Maintenance Task’. This task is added only when the installer detects missing rate ...
    • Using EFT Begin and End Dates in JobStream

      The attached document is a pdf version of this article. Introduced in v5.20.57 under ADO 40865 This item provides the ability to process EFT File Generation through JobStream using the same file generation parameters that are available when ...
    • Bulk Contract Update - Processing Bulk Contract Sales

      The attached document outlines the steps to process existing or new Bank Funding and Discount Pools The purpose of the document is to provide an overview of processing a bulk Contract Sales procedure. ASPIRE has tools available to automate this ...
    • Bulk Pool ID Update

      Bulk Pool ID Update There are various situations in which updating the Pool ID will allow you to process updates in Bulk through the Tasks > Bulk Contract Processing function in ASPIRE. The Pool ID can be used to select the contracts for update. ...